Bathroom Remodelers in Mission Viejo: Walk-in showers, new vanities and whole bathrooms remade

Measured in your Mission Viejo home, scheduled around your HOA's hours, and waterproofed with a membrane behind every tiled wall, not just the pan.

Bathroom Remodelers in Mission Viejo, CA

Out comes the fiberglass unit, and bathroom remodeling in Mission Viejo leaves the room dry behind new tile and laid out for your household.

A close shot of a shower mid-tile, hands setting a large format tile against a Kerdi waterproofing membrane

Mission Viejo Bathroom Pros is a bathroom remodeling contractor, working in Mission Viejo, Lake Forest and Laguna Niguel since 2014. Demolition on a booked remodel starts two to three weeks after the free measure, and the written scope is agreed before then.

Full bathroom remodels are most of the work, a 1970s or 1980s bathroom taken back to the studs and rebuilt to that scope. Showers and bathtubs come next, mostly tub to shower conversions. Tiling and waterproofing, vanities and storage, and accessible bathrooms are booked on their own.

Every shower gets a Schluter Kerdi sheet membrane behind the tile and a mortar bed sloped to the drain, so a leak never reaches the slab or the ceiling below.

Is a powder room too small a job for a bathroom remodeling contractor? A powder room retiled for a first-time buyer is a bathroom remodeling job booked the same way as a primary suite taken back to the studs for a Mission Viejo family that has outgrown it.

Mission Viejo Bathroom Pros quotes bathroom remodeling across Mission Viejo, Laguna Hills, Aliso Viejo and Ladera Ranch. Ask for a free measure at (949) 555-0157, and somebody drives out, measures the bathroom and leaves you a written scope before anything comes off the wall.

Everything in a Mission Viejo bathroom that we replace

  • Full Bathroom Remodeling
  • Powder Room Remodeling
  • Bathroom Flooring
  • Ventilation and Lighting
  • Tub to Shower Conversion
  • Walk-In Shower Installation
  • Bathtub Replacement
  • Tile Installation
  • Shower Pan and Waterproofing
  • Grout and Sealing
  • Vanity and Sink Installation
  • Bathroom Storage and Cabinets
  • Fixture and Faucet Replacement
  • Accessible and Barrier-Free Bathrooms
  • Walk-In Tubs
  • Grab Rails and Safety Fittings
Marco and Gabriela Alvarez standing side by side in black work shirts against a plain gray backdrop, both smiling at the camera
Mission Viejo Bathroom Pros monogram Marco and Gabriela Alvarez Founders and owners

Who we are

Who you are handing your only bathroom over to

Most of what we do is a 1970s or 1980s tract bathroom taken back to the studs. We have been doing it in Mission Viejo, Lake Forest and Laguna Niguel since 2014, and what the old fiberglass unit was hiding sets the job.

Nothing comes off your wall before the scope is written down and agreed, down to the tile and the drain body. We handle the permit and the HOA approval, and the whole job stays on one contract.

Why trust us

  • Demolition, plumbing, waterproofing, tile and the clean, one contract
  • Twelve years on 1970s and 1980s bathrooms in south Orange County
  • No trade to book and no schedule to chase while the bathroom is out

Services

Whole bathrooms, showers, vanities and tile in Mission Viejo

  • A gutted 1980s Mission Viejo bathroom mid remodel, new cement backer board on the studs, a boxed vanity leaning against the wall

    Full Bathroom Remodels

    For homeowners whose bathroom has not been touched since the house was built, and who want it done once rather than patched again in five years. A full remodel suits anyone replacing more than the fixtures, moving a wall or a drain, or dealing with a subfloor that has been quietly failing behind the old tub. It is the job for a bathroom that needs everything, not just the shower.

    Learn more about Full Bathroom Remodels
  • An original 1980s fiberglass tub-shower unit pulled out of a Mission Viejo bathroom and leaned against the hallway wall

    Showers and Bathtubs

    For anyone whose original fiberglass tub-shower unit has gone dull, cracked at a seam, or simply become hard to step over safely. This is the job when the rest of the bathroom is fine and only the shower or tub itself needs to change, whether that means converting to a walk-in shower, replacing a tub like for like, or building a shower a step wider than the one you have now.

    Learn more about Showers and Bathtubs
  • A half-finished shower stall with the waterproofing membrane visible on two walls and a sloped mortar bed on the floor, tile stacked nearby ready to be set

    Tiling and Waterproofing

    For homeowners who found a soft spot near the shower drain or a stain on the ceiling below an upstairs bathroom, tiling and waterproofing starts behind the wall, not at the grout line. It suits anyone re-tiling a shower or a bathroom floor who wants to know what is holding the water back, not just what tile sits on top of it.

    Learn more about Tiling and Waterproofing
  • A half-finished bathroom vanity installation in a Mission Viejo tract home, cabinet carcass set against the wall with countertop and sink not yet connected

    Vanities and Storage

    For anyone whose vanity has outlived the rest of the bathroom, or whose storage never matched what the family actually owns, this is a cabinet built to the room rather than picked off a shelf and made to fit. It suits a straight swap just as well as a full reconfigured layout, and either way it is measured against the plumbing before anything is ordered.

    Learn more about Vanities and Storage
  • A finished bathroom fitted with a curbless shower, a fold-down bench seat and a comfort-height toilet

    Accessible Bathrooms

    For someone staying in their own home after a fall or a new diagnosis, or an adult child arranging a parent's bathroom from out of state, the room has to work without looking like it belongs in a clinic. That's the part a standard remodel crew misses. Grab bars go into real blocking, showers lose their threshold, and the finish still looks like an ordinary bathroom.

    Learn more about Accessible Bathrooms

What goes into a Mission Viejo bathroom remodel

Every shower we build gets a sheet membrane behind the tile and a mortar bed sloped to the drain, not a pan liner.

A tub to shower conversion gets a Schluter Kerdi or equivalent sheet membrane behind every tiled wall, not a liquid membrane brushed on alone, because a sheet membrane does not thin out at the corners.

Vanities are set on cement board, never bare drywall, and every countertop is templated on site rather than cut to a stock size, so the sink and faucet holes line up the first time. Every drain gets a body rated for the tile depth specified, not a generic replacement.

Exhaust fans are sized to the room in cubic feet per minute, not swapped like for like, because an undersized fan leaves moisture behind new tile long after the water is off.

Kerdi membrane being rolled onto a shower wall stud bay, seams overlapped and sealed, before any tile goes on.
A shower drain body set into a sloped mortar bed, tile spacers and a level resting across the pan.
  • Kerdi membrane behind every tiled wall
  • Cement board under tile, never bare drywall
  • Countertops templated on site, not stock cut
  • Drains rated to the specified tile depth
  • Exhaust fans sized in CFM, not swapped like for like
  • Written scope agreed before demolition starts

Call (949) 555-0157 for a free in-home measure and a written quote before any tile comes off your bathroom wall.

(949) 555-0157

What south Orange County's tract homes change about a remodel

Original fiberglass tub-shower units hide decades-old plumbing, homes sit slab on grade with no basement to catch a leak, and many communities fix the hours work can run.

Original fiberglass units past their life
Most bathrooms here still have the fiberglass tub-shower unit the builder installed in the 1970s or 1980s, and the plumbing and subfloor behind it stay unknown until the unit comes out, which is usually when the real scope of the job gets set.
Slab on grade, with no basement below
With no basement under most of these homes, a leak behind an old shower shows up as damage to the slab itself or, on a two-story layout, as a stain on the ceiling of the room below, not as a puddle somewhere out of sight.
HOA rules on when work can run
Many Mission Viejo communities set fixed hours for anything loud enough to hear through a shared wall or a nearby yard, so demolition and tile cutting get scheduled around what the HOA allows before a single tool comes out.

What Mission Viejo homeowners said afterwards

  • Rated 5 out of 5

    Original 1974 bathroom, never touched since. Out in a day, finished in nine. The written scope matched the invoice.
    Ruben M. Lake Forest Full Bathroom Remodels
  • Rated 5 out of 5

    The shower had been wicking into the hall carpet for months. Once the tile came off they found rot in the subfloor and said straight out it would add a day and some money. It did. Dry ever since.
    Kathleen O. Laguna Niguel Tiling and Waterproofing
  • Rated 5 out of 5

    My mother moved in with us in March and the hall bath still had a step-in tub she could not manage. Curbless shower now, grab bars where she actually reaches for them, and they kept to the HOA hours.
    Teresa V. Mission Viejo Accessible Bathrooms

Every one of these started with a measure and a written scope. Ask for yours and see what it says.

Get a free quote

Bathrooms finished across south Orange County

Recent bathroom work finished around Mission Viejo and south Orange County, named by the town it was done in.

Still living with a 1980s bathroom?

A free measure, and the whole scope agreed before a tile comes off.

Get a free quote

Why do two Mission Viejo bathrooms cost such different amounts?

A powder room and a full bath the same size can quote very differently once the tile, the fixtures and what is behind the old tub are counted.

Level of finish
A builder-grade vanity and a stock shower kit cost less than a floor to ceiling tile job with a frameless glass enclosure and a built-in bench, and both are common requests in the same neighborhood.
Condition behind the old shower
A 1980s fiberglass tub-shower unit hides the plumbing and the subfloor behind it, and whether that is sound or needs replacing is not known until the unit comes out.
Waterproofing method
A Kerdi membrane and an uncoupling mat under a sloped mortar bed cost more up front than a pre-formed pan and last considerably longer in a shower used every day.
Tile size and layout
Large-format tile and a herringbone or offset layout take longer to set and cut than a standard running bond, and that labor is priced separately from the tile.
Access and HOA rules
A second-story bathroom or a community with restricted working hours can add time to a job that would otherwise take one crew a few days on a ground-floor slab.
Plumbing moved or kept
Keeping the shower, the tub and the vanity where the drains already run costs less than moving them, which means opening the slab or the wall to run new lines.

Once we have opened the wall or the floor and seen what the slab is actually doing underneath, the figure gets firm. Get a free quote

What a bathroom remodel is worth when you sell

A dated fiberglass tub-shower unit is one of the first things a buyer's inspector flags.

Published remodeling return figures move by finish level, region and market year, and quoting one for Mission Viejo is a promise this business cannot stand behind.

What holds value regardless of the number is more knowable. A membrane-waterproofed shower that never lets water reach the subfloor protects the investment long after the fixtures date. Keeping a tub where the house has only one protects resale to a family buyer even where a shower reads better today. A permitted remodel with signed-off HOA paperwork is worth more at closing than an unpermitted one.

The finish level matters less than whether the work stays sound for ten years, which is the half no report answers.

A finished primary bathroom, walk-in shower with a glass panel, floating vanity, towels hung and folded, nothing mid-installation.

From your call to a finished bathroom

Most bathrooms in Mission Viejo take one to two weeks from the first measure to a bathroom you can use again.

  1. Your call and a free visit

    Same week

    We come to the house, measure the bathroom and look at what is behind the old fiberglass tub or shower before anything is priced. You get a plain-language quote before we book a date.

  2. Tile and fixtures chosen

    One to two weeks

    Every tile, fixture and finish is picked and confirmed in writing before demolition starts, so the crew that shows up on day one is working from a plan, not guessing on site.

  3. Permits and HOA paperwork

    One to three weeks

    Where a permit or an HOA approval is needed we handle the paperwork and the scheduling, and we work within whatever hours your community allows before a tool comes out.

  4. Demolition and rough-in

    One to two days

    The old tub-shower unit and vanity come out, the plumbing is opened up, and any damage to the slab or the subfloor under a second-story bathroom is dealt with before it is covered.

  5. Waterproofing and tile

    Three to five days

    A membrane goes behind every tiled wall and a sloped bed or pan goes under the floor, then the tile, the vanity and the fixtures go in.

  6. Walkthrough and clean up

    Same day

    We walk the finished bathroom with you, run the water, test the drain and the fan, and clear away every offcut and box before we leave the house.

Call (949) 555-0157 for a free in-home assessment, or ask for a same-day callback and we will work around your schedule.

Get a free quote

The scope is settled before anything is torn out

Since 2014 the same team has taken 1970s and 1980s bathrooms in Mission Viejo, Lake Forest and Laguna Niguel back to the studs and rebuilt them. Demolition, plumbing, electrical, waterproofing, tile and the final clean sit under one contract with one number to ring. A household that has lost its only bathroom is not also running a schedule for four trades.

Call (949) 555-0157 or send the form for a free measure. What is being built, and what it is being built out of, is agreed in writing before a single tile comes off.

Get a free quote

A finished, in-use bathroom with a tiled walk-in shower and a fitted vanity, lit from a window.

Bathroom remodeling service area

Bathroom remodeling coverage across south Orange County

We remodel bathrooms throughout Mission Viejo and drive out across south Orange County for the right job, typically within a thirty-minute radius of home base.

Primary service area

Mission Viejo, CA

Mission Viejo Bathroom Pros 27201 Puerta Real, Ste 300, Mission Viejo, CA, 92691 (949) 555-0157

Also serving

  • Mission Viejo
  • Lake Forest
  • Laguna Hills
  • Laguna Niguel
  • Aliso Viejo
  • Rancho Santa Margarita
  • San Juan Capistrano
  • Ladera Ranch
  • Foothill Ranch
  • Coto de Caza
  • Portola Hills
  • Dove Canyon

Not on the list below? Call (949) 555-0157 anyway. Many nearby streets sit right on a boundary and we still cover them.

Insured
General liability and workers compensation
Established
12 years
Callback
Same day

FAQs

Frequently asked questions

Common questions about bathroom remodeling in Mission Viejo

Do you take on small jobs like a powder room refresh?

Yes. A powder room refresh, a vanity swap or a single fixture replacement gets the same free measure and written quote as a full remodel, and it is scheduled with the same crew rather than treated as an add-on to a bigger job already on the books.

Can you finish a bathroom another contractor left half done?

Yes, and it starts with opening up what is already there before anything is priced, because a half-finished bathroom often hides work that was never brought up to code or never waterproofed correctly. The quote covers correcting that as well as finishing what is left.

Does the quote include a new toilet and faucets?

Fixtures, faucets and hardware are itemized in the written quote before any demolition starts, so you know exactly what is included and what is an upgrade, rather than finding out once the old vanity and toilet are already out of the house.

How many days will I be without a working bathroom?

A full bathroom remodel typically leaves the room unusable for one to two weeks from demolition to final walkthrough, and a tub to shower conversion or vanity swap is usually a few days. If it is your only bathroom, we schedule around that and tell you the actual window before you book.

Should I convert my tub to a walk-in shower?

It depends on who else uses the bathroom. A household with young children or only one full bathroom in the house usually keeps at least one tub, while a primary suite with a second bathroom elsewhere is a common place to convert.

Does moving the shower drain cost more than keeping it put?

Yes, because moving a drain means opening the slab or subfloor to run new plumbing rather than tiling over the existing line, and on a slab on grade home that means cutting into concrete. Keeping the shower, tub and vanity where the drains already run is the biggest way to hold a remodel's cost down.

Will I need to move out while the work is done?

Most homeowners stay in the house for a bathroom remodel, including during demolition, though the room itself is off limits and dusty for several days. If it is your only bathroom we talk through a plan for that period before the quote is finalized, rather than leaving it for the first morning of the job.

What is Kerdi membrane and why does it matter in a shower?

It is a sheet waterproofing membrane installed behind the tile and under the shower floor instead of relying on grout or a thin painted-on coating to keep water out. It does not thin out at corners and seams the way a brushed-on liquid membrane can, which is where most fiberglass units failed in the first place.

Do I need to be home for the whole remodel?

No, though someone needs to be reachable and available for the initial measure, the material selections and the final walkthrough. Crews are insured and used to working in occupied homes, and a key or a code can be arranged for the days in between if you are not able to be there.

Is there anything I need to clear out before you start?

Clear the bathroom itself of anything personal, towels, rugs and items stored in the vanity, and let us know if a hallway or stairway the crew will use is narrow or has anything fragile nearby. Everything else, including protecting floors on the way in and out, is handled by the crew.

What happens if a tile cracks or a fixture leaks later?

Call the number you already have and describe what you are seeing. Workmanship issues that show up after the job is finished are addressed directly rather than treated as a new quote, and a leak behind new tile is taken seriously enough to open the wall and check the membrane if that is what it takes.

Do you handle the permit inspection at the end?

Yes. Where a permit was pulled for the job, scheduling the final inspection and being present for it is part of the scope, not a separate step left for you to arrange, and the signed-off paperwork is handed over once it passes.

Mission Viejo Bathroom Pros

Trading in Mission Viejo since 2014, with same-day callback on every inquiry.

Mission Viejo Bathroom Pros handles full bathroom remodels, shower and tub conversions, tiling and waterproofing, vanities and storage, and accessible bathrooms across Mission Viejo and the surrounding south Orange County. Most of the work is on 1970s and 1980s tract homes with original fiberglass tub-shower units past their working life.

Why call Mission Viejo Bathroom Pros before anyone else in Mission Viejo?

  • Twelve years remodeling bathrooms in Mission Viejo and south Orange County
  • Same-day callback on every inquiry, seven days a week
  • A written quote before any demolition starts
  • Kerdi membrane waterproofing behind every tiled wall, not just the pan
  • Insured crews you can have working inside the house

Every bathroom we take on in Mission Viejo starts with a free in-home visit and ends with a written scope before any tile comes off the wall, so there is nothing to guess at once the crew arrives. Call (949) 555-0157 to book yours and find out what the bathroom actually needs.

(949) 555-0157

Give us a call

27201 Puerta Real, Ste 300, Mission Viejo, CA, 92691

Where to find us

Book a free visit

(949) 555-0157 Get a free quote